Installation guide
Step 1
Turn off the power
You don’t want to electrocute yourself, so make sure to turn off the power going to your heating controls!


Step 2
Remove your current heating controls
Hopefully you’ve taken my advice from Step 1 onboard and you can now safely remove your current heating controls.
Tip: Take a photo of your existing wiring for reference.
Step 3a
Two-Wire Install
Fit the base plate and connect the 2 wires to L and V1.
CAREFUL NOW: Connecting the wires incorrectly will damage the device.


Step 3b
Three-Wire Install
Fit the base plate. Connect L and V1 to the top 2 wire slots (see Step 3a) and the neutral wire to the bottom slot.
CAREFUL NOW: Connecting the wires incorrectly will damage the device.
Step 4
Tighten the screws
Tighten my base plate to your wall using the screws in the box. Don’t forget to use the washer to make sure it’s on the level.


Step 5
Connect the front panel
Align the display with the right side of the base plate. Then push the left side down until it clicks into place.
Step 6
Ready to go
Success! The Hub Controller is now fully functioning and ready to go! It’ll start automatically so just follow the on-screen instructions to go to setup.
NOTE: If you have a programmer/timer, you will need to set it to constant on.

Installation video
What's next?
Learn how to pair the Hub Controller with your smartphone and how to use the Hub Controller in our Setup Guide.